User Tools

Site Tools


information_for_astronomers:user_guide:status

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
information_for_astronomers:user_guide:status [2017/06/21 10:53]
akraus
information_for_astronomers:user_guide:status [2023/11/02 11:42]
akraus
Line 1: Line 1:
 ====== Current Status of the observational system ====== ====== Current Status of the observational system ======
  
-//Last update: ​10. May 2017 - AK//+//Last update: ​see bottom right//
  
-The repair of the telescope track was successful. Regular observations restarted on May 11. 
  
-Receivers ​available:\\ +**Receivers ​currently installed at the prime focus:**\\ 
-^Prime focus^ ^ +^Receiver^Status^
-|Receiver|Status|+
 |P210-7|ok| |P210-7|ok|
-|P200|ok| +|P200/180|ok| 
-|P10|ok|+|P170 / UBB|currently under maintenance|
  
-^Secondary ​focus^ ^ +Please note, that there is new strong RFI at ~1475 MHz, influencing 
-|Receiver|Status| +also the protected band. The staff of the observatory is currently  
-|S130|ok +investigating possible measures. 
-|S110|ok + 
-|S60|ok + 
-|S45|high Tsys - being checked+**Receivers currently available in the secondary ​focus:**\\ 
-|S36|ok |+^Receiver^Status^ 
 +|S130|not available 
 +|S110|ok, wider bandwidth with the new EDD system - please contact staff
 +|S60|ok, only one horn available 
 +|S45|ok 
 +|S36|not available |
 |S28|ok | |S28|ok |
 |S20|ok | |S20|ok |
 |S14|ok | |S14|ok |
-|S9|ok | 
 |S7|ok | |S7|ok |
  
-Please note, that the S45 receiver (aka C+-band) ​is still under commissioningIf you want to use it, please ​let us know beforehand.\\ +The S-band has recently heavily been occupied by RFI (due to LTE). Observations with the 11cm-receiver should ​use the 8-bank polarimeter or the new spectro-polarimeter (please ​contact staff).\\
- +
- +
-\\ +
-__Outlook:​__ +
- +
- +
-During Jul 5 - Sep 1, our usual summer works will be done (telescope painting / corrosion protection). +
-In this time, the time between 0800-1900 hours on Mo-Fr will be unavailable for observations.+
  
 ---- ----
  
-For questions or comments, please contact **eff-support[at]mpifr-bonn.mpg.de**.+For //questions ​about the scheduling//​ please contact **sched100m[at]mpifr-bonn.mpg.de**.\\  
 +For //other questions// ​or comments, please contact **eff-support[at]mpifr-bonn.mpg.de**.\\  
 +Please also report RFI to the same email address.
information_for_astronomers/user_guide/status.txt · Last modified: 2023/11/02 11:43 by akraus