User Tools

Site Tools


information_for_astronomers:user_guide:vlba-eb_rdbe

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Last revision Both sides next revision
information_for_astronomers:user_guide:vlba-eb_rdbe [2014/08/18 16:13]
ubach created
information_for_astronomers:user_guide:vlba-eb_rdbe [2014/08/18 16:13]
ubach
Line 4: Line 4:
  
   - Proposals must be submitted using the NRAO web proposal tool. (Select VLBA and EB in the HSA section)   - Proposals must be submitted using the NRAO web proposal tool. (Select VLBA and EB in the HSA section)
-  - Use the Walker/NRAO SCHED program for making the observing schedule, available from anonymous ftp at: ftp.aoc.nrao.edu ​ Directory: pub/sched\\ The SCHED manual can be read at: [[http://​www.aoc.nrao.edu/​~cwalker/sched/​sched/​sched.html]]\\ A special section on the RDBE at: [[http://​www.aoc.nrao.edu/​~cwalker/​sched/​RDBE_system.html]]+  - Use the Walker/NRAO SCHED program for making the observing schedule, available from anonymous ftp at: ftp.aoc.nrao.edu ​ Directory: pub/sched\\ The SCHED manual can be read at: [[http://​www.aoc.nrao.edu/​~cwalker/​sched/​sched.html]]\\ A special section on the RDBE at: [[http://​www.aoc.nrao.edu/​~cwalker/​sched/​RDBE_system.html]]
   - Effelsberg recordings will be made using the RDBE terminal and a MK5 disk recorder. Effelsberg has SCHED station name '​EB_RDBE'​.\\ For further details regarding the RDBE, consult: [[https://​science.nrao.edu/​facilities/​vlba/​docs/​manuals/​oss/​sig-path/​rdbe]]   - Effelsberg recordings will be made using the RDBE terminal and a MK5 disk recorder. Effelsberg has SCHED station name '​EB_RDBE'​.\\ For further details regarding the RDBE, consult: [[https://​science.nrao.edu/​facilities/​vlba/​docs/​manuals/​oss/​sig-path/​rdbe]]
   - Deposit the schedule for EB_RDBE on the ASPEN file-server in Socorro, as for the VLBA schedule; the deadline is 2 weeks before the observation. The Effelsberg schedule will be retrieved from ASPEN by Effelsberg staff.   - Deposit the schedule for EB_RDBE on the ASPEN file-server in Socorro, as for the VLBA schedule; the deadline is 2 weeks before the observation. The Effelsberg schedule will be retrieved from ASPEN by Effelsberg staff.
information_for_astronomers/user_guide/vlba-eb_rdbe.txt ยท Last modified: 2014/08/18 16:39 by ubach