User Tools

Site Tools


schedules

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
schedules [2021/11/26 11:10]
akraus
schedules [2024/04/09 15:57] (current)
akraus
Line 4: Line 4:
 (high priority, good weather) (high priority, good weather)
  
-Nov 23 Dec 062021:| {{A_2021-11-23.pdf}} | +Apr 09 Apr 222024:| {{A_2024-04-09.pdf}}| 
-Dec 07 Dec 202021:| {{A_2021-12-07.pdf}} | +Apr 23 May 062024:| {{A_2024-04-23.pdf}}| 
-Dec 21, 2021 Jan 032022:| {{A_2021-12-21.pdf}} | +May 07 May 202024:| {{A_2024-05-07.pdf}}|
  
 === Plan B === === Plan B ===
 +
  
  
Line 18: Line 18:
 of the project on plan A, which is labeled with a *.\\  of the project on plan A, which is labeled with a *.\\ 
 The latest time for the decision is indicated by the red dot in the schedule. ​ The latest time for the decision is indicated by the red dot in the schedule. ​
-If no red dot is given, the decision has to be made latest ​30 mins before the+If no red dot is given, the decision has to be made not later than 30 mins before the
 start of the observation.\\ start of the observation.\\
  
schedules.1637921402.txt.gz · Last modified: 2021/11/26 11:10 by akraus